

— ABOUT NIVJIYA DIGITAL
MEPF BIM EXECUTION, WITHOUT THE GUESSWORK.
Nivjiya Digital was built on a single premise: architecture and engineering teams shouldn't have to choose between design velocity and coordination precision. We exist as the technical execution layer between design intent and construction-ready delivery.
We treat every model as a piece of information infrastructure, not just geometry. Naming conventions, LOD assignments, and file structures are governed from day one — so your model remains usable, auditable, and handover-ready long after our engagement ends.
Our teams work within your project timezone, using your preferred CDE (ACC or equivalent), integrating into your existing coordination meetings and issue-tracking cadence — functioning as an extension of your VDC team, not an outsourced silo.
HOW WE WORK
DATA INTAKE & SCOPING
MODELING & LOD ASSIGNMENT
CLASH COORDINATION CYCLES
COORDINATED DELIVERY
Existing models or design intent received and audited against ISO 19650 CDE structure.
Federated model, clash reports, and construction documentation issued through ACC.
MEPF systems modeled to the agreed LOD for the current project stage.
Structured Navisworks clash runs with issue tracking and resolution logs.


